patios

Patios & Walkways

Paver patios, walkways and sitting areas. The part nobody sees is the base, and the base is why a patio stays flat.

What it covers
Paver patios, walkways, steps and sitting areas
Typical job
Rear patio, front walkway, or a patio and bed package
Season
Spring through late fall, weather permitting
Pricing
Quoted per square foot after an on site walk

Runs in

A paver patio is mostly excavation. What you pay for is the six to eight inches of compacted stone under the pavers, because that is the difference between a surface that is still flat in five years and one that sinks at the low corner after one winter.

Work photos

Patios & Walkways on local properties

New concrete patio framed by black mulch beds and a river rock border
Foundation bed with black mulch, river rock border and solar path lights, with a Robert's Four Seasons yard sign
Fresh black mulch bed cut along an aluminum fence line behind a Bucks County home

What is included

What is included

  • Excavation and base

    Dug to depth and backfilled with compacted crushed stone in lifts. Skipping compaction is the single most common reason a patio settles.

  • Screeded bedding layer

    A consistent sand setting bed screeded flat, not spot leveled under each paver as it goes down.

  • Pattern and cuts

    Field laid to the pattern you pick, with cut edges kept tight against the border course.

  • Edge restraint

    Restraint pinned along the perimeter. Without it the outside course walks outward and the joints open.

  • Polymeric sand

    Joints swept, compacted and locked so the surface sheds water and resists weeds between the pavers.

  • Grading away from the house

    Pitched to carry water away from the foundation rather than pond against it.

From first text to done

  1. 1

    Walk the space on site

    Patios do not get quoted from a photo. Grade, drainage and access all change the number, so this one needs a visit.

  2. 2

    Pick material and pattern

    Paver style, color and border laid out so you can see it before anything is ordered.

  3. 3

    Build from the bottom up

    Excavate, base, compact, screed, lay, cut, restrain, sand. Each stage gets done before the next starts.

About patios

How long does a paver patio take to build?

A straightforward residential patio is usually a two to four day job depending on square footage, how much excavation is involved and how far material has to be carried from the driveway. Rain pushes the schedule, because base material has to be compacted at the right moisture content rather than soaked.

Do I need a permit for a patio in Bucks County?

It depends on the township and on whether the patio is at grade or raised. Some municipalities treat an at grade paver patio as an improvement that needs no permit, others want it reviewed for impervious coverage. Check with your township before work starts, since the requirement varies from one town on this list to the next.

Why do patios sink at one corner?

Almost always base failure or water. Either the stone base was not deep enough or not compacted in lifts, or the patio was pitched so runoff collects at that corner and washes fines out from under the pavers. Both are avoidable at build time and expensive to correct afterward.

Get a price on patios

Text the address or a photo of the property and you get a number back.

Free estimates. No obligation. Call or text (267) 665-7936.